SJ Group is united together, curb the epidemic situation, and resume work and production in an orderly manner!

SJ Group is united together, curb the epidemic situation, and resume work and production in an orderly manner!

Time:2020-03-02 | Views:1

On the afternoon of February 9, Guo Ziping, Mayor of Bao'an District, Shenzhen, led his team to Shajing Street and Xinqiao Street, inspected Shouju's resumption of production and made important instructions, and emphasized the need to effectively strengthen classification guidance and ensure the orderlyness of the enterprise. Resumption of work.
Shouju is a world-renowned R & D, design and manufacturing company of precision plastic molds, and is an important link in the medical equipment production chain.
Due to the shortage of manpower caused by the epidemic, our company submitted an application for resumption of work to Baoan District. After verification, our company has the qualification for resumption of work as stipulated in the Implementation Plan for the Reinstatement of Pneumococcal Disease Outbreak Prevention and Control Enterprises in Baoan District.
As the first batch of enterprises in Shenzhen that have resumed work and resumed production, our company strictly implements quarantine inspection and health protection measures in accordance with the "Shenzhen Enterprise Resumption and Guidelines for the Prevention and Control of Pneumonia of New Coronavirus Infection":

 

1. Prevention and control mechanism : Our company clarifies the internal responsibility mechanism for epidemic prevention and control, establishes an epidemic prevention and control management system, clarifies the work responsibilities of the main person in charge, the person in charge of the department, and the person in charge of the department team of the department, and formulates emergency plans for epidemic prevention and control And work measures.

2. Staff investigation: Our company conducts an investigation on the origin and whereabouts of each employee within 14 days. Establish a key monitoring list for employees who have come to or from the infected area, and advise them to stay in the local area and not return to resume work in Shenzhen, and encourage employees to delay their return to work; confirm the date who arrives in Shenzhen. Complete the implementation of internal medical observation and self-isolation measures in accordance with regulations to ensure that they can observe and isolate for 14 days and take a post after taking a normal temperature measurement.

 

3. Supply of protective materials: Our company prepared the necessary prevention and control materials, purchased rapid infrared temperature detectors, disinfection water, masks and other epidemic prevention and control materials; set up temporary isolation places, and arranged single rooms and relatively independent rooms for return to the epidemic area Temporary quarantine.

4. Internal management: Our company implements closed management and prohibits irrelevant personnel from entering the production office of the unit; daily temperature detection of all employees at work before entering the factory, body temperature detection of all personnel entering the company, and reporting according to regulations Resumption of workers and health status of employees; Rehabilitation of site ventilation, disinfection, sanitation management and isolation area control; training of all staff on epidemic prevention and control before returning to work.

 

Guo Ziping, Bao'an District Chief led his team to check the resumption of work and production

郭子平视察复工复产情况.jpg

Envisioning what’s next? Let’s build it together. Contact Us

Envisioning what’s next? Let’s build it together.